Built to order · Anywhere in the country

One-of-a-kind furniture, built to your room

Five years building one-of-a-kind furniture. Benches, tables, bars, bed frames, couches and the odd piece nobody else makes, built to the room it is going into.

5 yearsAt the bench
Built to orderEvery piece
Meet the ownerKordell Kitching
Shipped, driven, or built on siteAnywhere in the country

Recent work

Every piece built to a room, not to a catalogue

What I build

Built to order, start to finish

Benches
01

Benches

Basic or fully customized, cut to the length of the wall, the entryway or the table it has to live with. The piece the business is named after.

Tables and dining sets
02

Tables and dining sets

Dining tables with matching benches, built to your room and your measurements rather than to a catalogue size.

Bars and bar tops
03

Bars and bar tops

Home bars with a finished top, a foot rail and a back that fits the wall you already have.

Bed frames and headboards
04

Bed frames and headboards

Frames and headboards sized to the mattress you own and the ceiling you are working under.

Couches and seating
05

Couches and seating

Built seating for the spot the room actually has, not the spot a floor model was designed for.

Smaller pieces
06

Smaller pieces

TV stands, cigar ashtray stands, shelving. The one-off you cannot find anywhere because nobody makes it.

How it works

What it takes to get a piece built

  1. Tell me what you have in mind

    Tell me what you have in mind

    What the piece is, the room it goes in, a rough size. Photos of anything you like the look of.

  2. I send you an estimate

    I send you an estimate

    Scope of work, the price, and estimated start and completion dates. In writing, before anything is cut.

  3. Half reserves your build

    Half reserves your build

    A 50% deposit holds your project dates and buys the materials. It is non-refundable once the material is bought. Cash, check, Zelle or Cash App.

  4. I build it

    I build it

    One piece at a time, by hand. Timelines can move with material availability, and you hear it from me if they do.

  5. The remaining half is due at completion

    The remaining half is due at completion

    Half was paid up front to reserve the dates and buy the material. The other half is due when the piece is finished and you have seen it.

  6. However it needs to get to you

    However it needs to get to you

    Shipped, driven out, or I fly to you and build it on site. Anywhere in the country.

Tell me what you have in mind

A photo, a rough size, the room it is going in. That is enough to start.

Book a consultation